Events
The Ultimate Event Guide for the FrankfurtRhineMain Metropolitan Region
May 2025
  • Mo
  • Tu
  • We
  • Th
  • Fr
  • Sa
  • Su
  • 28
  • 29
  • 30
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 1

Construction sites during the summer holidays 2018

20.06.2018 | 06:39 Clock | Service
Construction sites during the summer holidays 2018
The summer holidays are often used to carry out important construction work, as the traffic chaos during these weeks is usually limited. Now the road traffic department has informed about traffic-relevant construction measures in the city area starting during the summer holidays. You can find an overview for better planning to avoid and - if possible - bypass the affected areas HERE: Westend / Nordend Surface renewal Eschersheimer Landstraße between Hansaallee and Holzhausenstraße Partial closures, reduction of the roadway to one lane per direction Construction time: Monday, 9.July, until Sunday, 5.August Nied Sewer construction work for the development of a new residential area in the Mainzer Landstraße between Nieder Kirchweg and Nidda Partial closures, reduction of the roadway to one lane per direction Construction time: Monday, 25.June, until Saturday, July 14 Fechenheim New construction of the so-called "Neckermannbrücke" in the Hanauer Landstraße Ongoing construction work, here: changed traffic routing for the production of the road surface incl. Removal of the temporary ramps Three full closures in the direction of the city; each from Saturday, 9 p.m., to Monday, 5 a.m. Planned dates: 1. Saturday, June 30, through Monday, July 2 2. Saturday, July 21, through Monday, July 23 3. Saturday, July 28, through Monday, July 30.July Construction time: until December Sachsenhausen-Süd New construction of the road bridge over the Luderbach in Kennedyallee / corner Richard-Strauß-Allee Ongoing construction work, here: changed traffic routing in Kennedyallee: Single lane traffic routing in each direction during the summer holidays +1 week Construction period: Until November Airport / Schwanheim Schwanheimer Bahnstraße between Unterschweinstiege and Schwanheim Ceiling renewal Construction under partial closure Construction time: Monday, 23.July, until Friday, 27.July, 5 p.m. Construction under full closure Construction time: Friday, July 27, 6 p.m., to Sunday, 29.July, 24 h Interstadt Neue Mainzer Straße private crane lifting work for an elevated construction Full closure of Neue Mainzer Straße between Kaiserstraße and Große Gallusstraße Construction time: Friday, 20.July, 20 o'clock, until Monday, 23.July, 6 o'clock Westend Relocation of supply lines in the Senckenberganlage into the city between Robert-Mayer-Strasse and Georg-Voigt-Strasse Reduction to 2 lanes citybound, the opposite lane is not affected Construction time: Monday, 25.June, through Friday, 3.August Deutsche Bahn (DB) Last S-Bahn tunnel closure in the inner city area No S-Bahn traffic between Hauptbahnhof and Mühlberg / Südbahnhof Construction time: Saturday, June 23, to Friday, 3.August Outlook for some construction sites after the summer holidays until autumn 2018 Gallus.NKleyerstrasse between Sondershausenstrasse and A5 underpass Renewal of pavements, partial closure of carriageway Construction period: Monday, 13.August, until November Gallus / Gutleutviertel New bridge construction on Camberger Straße between Gutleutstraße and Mainzer Landstraße Partial closure, establishment of a one-way street in the direction of Mainzer Landstraße Reroute via Hafentunnel Construction time: Wednesday, 22.August, until July 2019 Gallus Mainzer Landstraße towards the city centre between Galluswarte and Hafenstraße Pavement resurfacing, partial closures in sections 36.51 Traffic site coordination 15.06.2018 Construction period: early October to early November European Quarter European Tunnel closures due to maintenance Time period: Late October/early November City Theatre tunnel closures due to maintenance Timeframe: Tuesday, 30.October, until Thursday, 01.November, in each case from 21 o'clock to 6 o'clock Altstadt / Sachsenhausen Lange Straße between Rechneigrabenstraße and Schöne Aussicht as well as Dreieichstraße between Große Rittergasse and Lokalbahnhof Rehabilitation of the tracks There are 2 lanes available in each direction Construction time: Monday, 6.August, until Monday, 20.August, 3 o'clock Sachsenhausen Intersection Stresemannallee / Gartenstraße / Theodor-Stern-Kai Track construction; full closure of the track crossings, lane reduction on the Friedensbrücke Full closure of left turns from Stresemannallee into Theodor-Stern-Kai; full closure of left turns coming from the direction of Uniklinik from Gartenstraße into Stresemannallee Construction time: Monday, 1.October, until Monday, 15.October, 5 o'clock Gallus / Bahnhofsviertel Niddastraße between Hafenstraße and Taunusanlage relocation of a 110 kV power line Karlstraße, partial closures Temporary full closure of Düsseldorfer Straße expected in late 2018 / early 2019 Construction period: (has already started) until February 2019 You can find more current traffic information on the Internet at: http://www.mainziel.de

More News